Product Detail :
|
Construction of following works on turnkey basis under State Plan (8020)-
1. Construction of LILO of both circuit of 132KV transmission line Banka(PG)- Sultanganj with HTLS Conductor (10 RKM).
2. Reconductoring of 132 KV D/C T/L Banka(PG) – Sultanganj (46.5 RKM) and 132KV S/C T/L Kahalgaon (NTPC) – Sabour (BSPTCL) (34 CKM) with HTLS conductor .
|