Product Detail :
|
Design and build two nos sewage treatment plant of installed capacity 2.5 mld on river harbora and 4.5 mld on belwa-sathi canal alongwith all appurtenant structures and allied works controlled with scada (III) survey, review the designs, redesign where necessary, and build 4 nos spaslong with 6.12 km interception drain including screens and mechanically operated gates facilitating surface water runoff into rover/ canal (III) operation and maintenance of the complete works of sewage treatment plant, sps, interception & diversion works, and effluent channel for a period of 15 years.
|